Acute Care – 好色tv Tue, 24 Jun 2025 14:39:10 +0000 en-US hourly 1 https://wordpress.org/?v=7.0.5 /wp-content/uploads/2022/03/favicon.svg Acute Care – 好色tv 32 32 NCH Generator Replacement /portfolio/nch-generator-replacement/ Tue, 24 Jun 2025 14:39:09 +0000 /?post_type=portfolio&p=4294 Modernizing Generator Systems for Peak Performance

The post NCH Generator Replacement appeared first on 好色tv.

]]>
This project involves a major power infrastructure upgrade, including modifications to three existing 1500kW generators to support onboard paralleling gear compatibility. As part of the scope, two of the three generators will be replaced with new 2500kW units, significantly increasing power capacity and system efficiency.

The post NCH Generator Replacement appeared first on 好色tv.

]]>
Westwide Regional Medical Center PACU Renovation /portfolio/westwide-regional-medical-center-pacu-renovation/ Mon, 25 Mar 2024 12:57:07 +0000 /?post_type=portfolio&p=3566 Renovating an anesthesia care unit at Westwide Regional Medical Center.

The post Westwide Regional Medical Center PACU Renovation appeared first on 好色tv.

]]>
12,000 sq. ft. renovation of the post anesthesia care unit as well as the staff locker room and lounge.

The post Westwide Regional Medical Center PACU Renovation appeared first on 好色tv.

]]>
HealthSouth Chesapeake Rehabilitation Hospital /portfolio/healthsouth-chesapeake-rehabilitation-hospital/ Mon, 25 Mar 2024 12:48:39 +0000 /?post_type=portfolio&p=3556 Building a two-story admin building and palliative care center.

The post HealthSouth Chesapeake Rehabilitation Hospital appeared first on 好色tv.

]]>
This project consisted of a two-story 24,000 sq. ft. administration building that included a palliative care center.

The post HealthSouth Chesapeake Rehabilitation Hospital appeared first on 好色tv.

]]>
Jackson Hospital OR Expansion and CEP Upgrade /portfolio/jackson-hospital-or-expansion-and-cep-upgrade/ Mon, 25 Mar 2024 12:33:06 +0000 /?post_type=portfolio&p=3553 Renovation the OR unit of Jackson Hospital.

The post Jackson Hospital OR Expansion and CEP Upgrade appeared first on 好色tv.

]]>
13,700 sq. ft. first floor renovation and 12,000 sq. ft. expansion of the existing operating room unit of the hospital.

The post Jackson Hospital OR Expansion and CEP Upgrade appeared first on 好色tv.

]]>
UHS Wellington Regional Medical Center OR Expansion /portfolio/uhs-wellington-regional-medical-center-or-expansion/ Thu, 21 Mar 2024 18:08:12 +0000 /?post_type=portfolio&p=3546 Completing an renovation for Wellington Regional Medical Center.

The post UHS Wellington Regional Medical Center OR Expansion appeared first on 好色tv.

]]>
3,800 sq. ft. renovation of existing space converted to two new Minimally Invasive Operating Rooms and viewing room used for educational purposes.

The post UHS Wellington Regional Medical Center OR Expansion appeared first on 好色tv.

]]>
HMA Shands at Lake Shore Labor & Delivery Renovation /portfolio/hma-shands-at-lake-shore-labor-delivery-renovation/ Thu, 21 Mar 2024 18:00:58 +0000 /?post_type=portfolio&p=3543 Completing an extensive renovation of the Labor and Delivery Unit at Shands Lake Shore Regional Medical Center.

The post HMA Shands at Lake Shore Labor & Delivery Renovation appeared first on 好色tv.

]]>
20,000 sq. ft. design-build interior renovation project of the existing 3rd and 4th floor labor and delivery unit. This project consisted of class IV ICRA and was completed in 7 phases. The scope work included the replacement of two air handling units along with all new controls and all required code upgrades. Project features include new nurse stations, new bathrooms with showers in the patient rooms along with corridor upgrades. The project was inspected by AHCA multiple times due to the extensive phasing.

The post HMA Shands at Lake Shore Labor & Delivery Renovation appeared first on 好色tv.

]]>
Naples Community Hospital 5th Floor North Orthopedic Unit Renovation /portfolio/naples-community-hospital-5th-floor-north-orthopedic-unit-renovation/ Thu, 21 Mar 2024 17:55:58 +0000 /?post_type=portfolio&p=3540 Completing an orthopedic unit renovation for NCH Healthcare System.

The post Naples Community Hospital 5th Floor North Orthopedic Unit Renovation appeared first on 好色tv.

]]>
Renovation of 31-bed orthopedic unit. The scope of work included MEP upgrades and replacement, finishes and casework. This project was completed under budget and 3 weeks ahead of schedule.

The post Naples Community Hospital 5th Floor North Orthopedic Unit Renovation appeared first on 好色tv.

]]>
Naples Community Hospital 4th Floor Medical Surgical Unit Renovation /portfolio/naples-community-hospital-4th-floor-medical-surgical-unit-renovation/ Thu, 21 Mar 2024 17:52:39 +0000 /?post_type=portfolio&p=3533 Completing a medical surgical unit renovation for NCH Healthcare System.

The post Naples Community Hospital 4th Floor Medical Surgical Unit Renovation appeared first on 好色tv.

]]>
Renovation of 28-bed medical surgical patient unit. The scope of work included MEP upgrades, replacement finishes and casework. This project completed 2% under budget and three weeks ahead of schedule.

The post Naples Community Hospital 4th Floor Medical Surgical Unit Renovation appeared first on 好色tv.

]]>
UHS Wellington Regional Medical Lab Renovation /portfolio/uhs-wellington-regional-medical-lab-renovation/ Thu, 21 Mar 2024 17:44:16 +0000 /?post_type=portfolio&p=3527 Completing a blood lab renovation and expansion for Wellington Regional.

The post UHS Wellington Regional Medical Lab Renovation appeared first on 好色tv.

]]>
4,500 sq. ft. renovation and expansion of the existing blood lab. Construction took 6 months and was completed in 3 phases. The existing lab remained fully operational the entire duration of the project.

The post UHS Wellington Regional Medical Lab Renovation appeared first on 好色tv.

]]>
HCA Citrus Memorial Hospital OR, Endoscopy, & Waiting Room Renovation /portfolio/hca-citrus-memorial-hospital-or-endoscopy-waiting-room-renovation/ Thu, 21 Mar 2024 17:20:59 +0000 /?post_type=portfolio&p=3521 Completing an extensive interior renovation at Citrus Memorial Hospital.

The post HCA Citrus Memorial Hospital OR, Endoscopy, & Waiting Room Renovation appeared first on 好色tv.

]]>
2,500 sq. ft. interior renovation including the conversion of 4 existing OR鈥檚 to 2 new orthopedic/spine OR鈥檚 with a sub sterile room, supply room, renovation of the Endoscopy clean and decontamination room as well as Deco renovation of the existing OR eating room and restrooms.

The post HCA Citrus Memorial Hospital OR, Endoscopy, & Waiting Room Renovation appeared first on 好色tv.

]]>